Energy Systems

6 reports · 2 insights

Works

Jun 2026Energy SystemsQuantifying Climate Risk Premium in Coal power plant: A case study of Samchoek Power PlantPLANiT built the Climate Risk Premium (CRP) model, which re-prices an asset's value by applying both physical and transition risk. The analysis found that Samcheok Blue Power's credit rating, currently A+, could fall to the lower end of investment grade or into speculative grade depending on the scenario.16ppJoowon Kweon, Jinsu Park
Nov 2025Energy SystemsJeju curtailment: the benefits of lowering minimum generation capacityQuantifying how lowering minimum generation capacity thresholds in Jeju could reduce renewable curtailment by up to 70% and save ₩4.5 billion in fuel costs.38ppSanghyun HongSolutions for Our Climate
Oct 2025Renewable Energy·Energy SystemsAgrivoltaic, the baseload for decarbonised distributionSix site typologies across Jeolla and Gyeongsang. How co-locating solar with agriculture supplies distributed baseload while preserving farmland productivity.84ppSanghyun Hong, Sojin Jun, Jinsu Park
Sep 2025Energy SystemsDemand falls, capacity remains: Korea's LNG terminal stranded asset warningQuantifying the asset risk in Korea's LNG terminal expansion against falling demand projections.56ppJinsu ParkSolutions for Our Climate
Jun 2025Energy SystemsBridging East Asia: assessing system costs of an energy islandA reduced-order model comparing interconnection scenarios across KR–JP–CN.92ppSanghyun HongHeinrich Böll Foundation East Asia Office
May 2025Semiconductors·Energy SystemsYongin semiconductor cluster: boosting competitiveness with renewablesHow the Yongin semiconductor cluster can meet RE100 targets and strengthen industrial competitiveness through renewable energy procurement.55ppSanghyun HongGreenpeace, Solutions for Our Climate